Specification Section 02221 Excavation, Filling, and Backfilling for Buildings, Part 3 - Excavation, Paragraph 3.12 Filling and Backfilling states that "Satisfactory material shall be used in bringing fills and backfills to the lines and grades indicated below the structure . . ." . Specification Section 02221 Excavation, Filling, and
Get a quoteA. Section 02221 – Excavating and Stockpiling. B. Section 02222 – Engineered Fill, Drainage Layer, and Anchor Trench Backfill. C. Section 02779 – GCL. 1.3 REFERENCES Latest ASTM Standards or other recognized agency standards at the time construction documents are issued for the following items: A. Compaction Characteristics of Soil
Get a quote(02/09/04) Section 02221 – 3 1.05 MEASUREMENT AND PAYMENT Measurement and payment of trench excavation and backfill shall be included in the cost per lineal foot of the size of pipe installed or the structure constructed. 1.06 PERMIT A. For trenches or excavations five feet (5') deep or deeper, the Contractor shall obtain
Get a quoteUPDATE LOG FOR SECTION 02221 TRENCHING, BACKFILLING, AND COMPACTING Date Item(s) Changed Page # 042215 3.03 CONSTRUCTION . C. Fill, Backfill & Grading . 2. Pipeline Backfill The remaining trench backfill shall consist of select backfill material from the excavation, when available, free from stones or lumps exceeding 3" in greatest
Get a quoteA. The work of this section includes, but is not limited to: 1. Clearing 2. Grubbing 3. Stripping and stockpiling topsoil 4. Debris disposal B. Related Work Specified Elsewhere: 1. Site excavation and placement of fill material: Section 02210 2. Trenching, backfilling and compacting: Section 02221 3. Roadway excavation, fill, and compaction
Get a quoteA. Trenching and Excavation Backfill: Select fill materials as specified in Section 02221 B. Concrete Slurry: Select Flow Fill as specified in Section 02221 C. Concrete Pavement: Select concrete paving materials as specified in Section 02520 D. Asphalt Pavement: Select asphaltic paving materials as specified in Section 02513
Get a quote02221-1 SECTION 02221 TRENCHING AND BACKFILLING INSIDE THE LIMITS OF WASTE PART 1. GENERAL 1.01 SCOPE OF APPLICATION A. Furnish all labor, material, tools, equipment and incidentals required to perform trench excavation and backfill operations necessary to achieve the specified grades and elevations shown on the Construction Drawings.
Get a quoteProject No. SPECIFICATION GUIDELINES 02221 - 1 02221 EXCAVATING, BACKFILLING AND COMPACTION FOR UTILITIES A. Excavation, filling, and backfilling for utilities complete for underground utility lines and Do not proceed with the work of this section until conditions detrimental to the proper and
Get a quote02221 Excavation, Filling, and Backfilling for Buildings and Utilities 02223 Contaminated Excavation 02225 Earthwork for Roadways 02235 Roadways 02250 Thermal Treatment, Residue Handling, Backfilling and Grading
Get a quoteSECTION 02221 - TRENCHING, BACKFILLING AND COMPACTING FOR UTILITIES – Page 2 1.5 PROJECT CONDITIONS A.Avoid overloading or surcharge a sufficient distance back from edge of excavation to prevent slides or caving. 1. Maintain and trim excavated materials in such manner to be as little inconvenience as possible to public and adjoining property owners.
Get a quote3.01 General. Excavation, installation, and backfill shall be done in accordance with section 02221 "Trenching, Backfilling, and Compaction" of this manual. . 3.02 Cleaning and Inspection . Clean all pipe and appurtenances thoroughly of all foreign material and …
Get a quoteSECTION 02221 - TRENCHING, BACKFILLING AND COMPACTING PART 1 - GENERAL 1.1 SECTION INCLUDES A. Trench Excavation. B. Bedding and backfilling. C. Surface Restoration. 1.2 DEFINITIONS A. Subgrade: Trench bottom prepared as specified to receive pipe bedding, concrete cradle
Get a quoteTrenching, Backfilling, and Compacting Section 02221 – 5 and practice and the Contract Drawings. Excavations shall include the removal and disposal of all materials of whatever nature and quantity including water, rock, decomposed granite, or any other type …
Get a quoteA. Section 02220: Excavation and Embankment B. Section 02221: Trenching, Excavating and Backfilling 1.03 RELOCATION OF UTILITIES A. Water, gas, electric, telephone, chilled water, steam, and other above and underground utilities: The Contractor shall be responsible for coordinating with the appropriate utility
Get a quoteUPDATE LOG FOR SECTION 02221 TRENCHING, BACKFILLING, AND COMPACTING Date Item(s) Changed Page # 042215 3.03 CONSTRUCTION . C. Fill, Backfill & Grading . 2. Pipeline Backfill The remaining trench backfill shall consist of select backfill material from the excavation, when available, free from stones or lumps exceeding 3" in greatest
Get a quoteSection 02221- Utility Trenching, Backfilling And Compacting Part 1 - General 1.01 Related Documents A. Contract provisions, Drawings, and Division 1 Specification sections apply to work of this Section. 1.02 Summary A. The work covered by this section includes the …
Get a quoteJan 10, 2011 · 3. Excavation and Fill for Roadway Construction 4. Preparation of Subgrade for Slabs on Grade, Walks and Pavement 5. Structural Fill, Excavation and Backfill for Site Retaining Walls and Foundations B. Related Sections: 1. Temporary Erosion Control: Section 02270. 2. Trenching and Backfill: Section 02221 Excavating, Backfill and Compacting for
Get a quote1720.98 02221-1 ARRO BTMA – STD. SPECS 3/2019 SECTION 02221 TRENCHING, BACKFILLING, AND COMPACTING PART 1 - GENERAL 1.01 SECTION INCLUDES A. Trench Excavation for Piped Utilities. B. Bedding and Backfilling. C. Surface Restoration. 1.02 RELATED SECTIONS A. Soil Erosion and Sedimentation Control: As shown on approved Subdivision Plans.
Get a quoteProject No. SPECIFICATION GUIDELINES 02221 - 5 depth of not less than 6 inches and a cushion of rock free soil or coarse sand used for not less than 6 inches bedding and 12 inches backfill over the plastic pipe. g. Perform this part of the excavation manually a few feet ahead of the pipe laying operation by workers skilled in this type of work. 2.
Get a quoteCity of Loveland, CO 02221 - 1 SECTION 02221 TRENCHING, BACKFILLING AND COMPACTING PART 1 GENERAL 1.01 SUMMARY A. This section addresses excavation and trenching; including subsurface drainage, dewatering, preparation of subgrade, pipe bedding, backfilling, compacting, and finish grading for underground storm sewers or